BEGIN:VCALENDAR
VERSION:2.0
PRODID:-//St Lucie TPO - ECPv6.15.15//NONSGML v1.0//EN
CALSCALE:GREGORIAN
METHOD:PUBLISH
X-ORIGINAL-URL:http://www.stlucietpo.org
X-WR-CALDESC:Events for St Lucie TPO
REFRESH-INTERVAL;VALUE=DURATION:PT1H
X-Robots-Tag:noindex
X-PUBLISHED-TTL:PT1H
BEGIN:VTIMEZONE
TZID:UTC
BEGIN:STANDARD
TZOFFSETFROM:+0000
TZOFFSETTO:+0000
TZNAME:UTC
DTSTART:20230101T000000
END:STANDARD
END:VTIMEZONE
BEGIN:VEVENT
DTSTART;TZID=UTC:20241204T140000
DTEND;TZID=UTC:20241204T153000
DTSTAMP:20260509T220229
CREATED:20241127T223748Z
LAST-MODIFIED:20241213T182059Z
UID:3689-1733320800-1733326200@www.stlucietpo.org
SUMMARY:﻿﻿St. Lucie TPO Board Meeting
DESCRIPTION:Agenda\nAgenda Packet \n					\n					\n				\n \n	\n\nThis video is located at http://stlucietpo.org/TPO_video_meetings/TPODecember4_2024.mp4
URL:http://www.stlucietpo.org/event/st-lucie-tpo-board-meeting-6/
LOCATION:Coco Vista Centre\, 466 SW Port St. Lucie Blvd\, Suite 111\, Port St. Lucie\, United States
CATEGORIES:TPO Board
END:VEVENT
BEGIN:VEVENT
DTSTART;TZID=UTC:20241213T100000
DTEND;TZID=UTC:20241213T113000
DTSTAMP:20260509T220229
CREATED:20240924T160056Z
LAST-MODIFIED:20241206T203923Z
UID:6045-1734084000-1734089400@www.stlucietpo.org
SUMMARY:Treasure Coast Scenic Highway Committee (TCSHC) Meeting
DESCRIPTION:Agenda\nAgenda Packet
URL:http://www.stlucietpo.org/event/treasure-coast-scenic-highway-committee-tcshc-meeting/
LOCATION:Coco Vista Centre\, 466 SW Port St. Lucie Blvd\, Suite 111\, Port St. Lucie\, United States
CATEGORIES:TCSH
END:VEVENT
BEGIN:VEVENT
DTSTART;TZID=UTC:20241219T170000
DTEND;TZID=UTC:20241219T190000
DTSTAMP:20260509T220229
CREATED:20241213T201432Z
LAST-MODIFIED:20241213T201432Z
UID:6321-1734627600-1734634800@www.stlucietpo.org
SUMMARY:Open House for the State Road (SR) 607/Emerson Avenue Resurfacing Project
DESCRIPTION:The Florida Department of Transportation (FDOT) invites the community to a Construction Open House both in-person and virtually for the SR 607/Emerson Avenue Resurfacing Project within St. Lucie County. \nThe Virtual Public Meeting is scheduled for Thursday\, December 19\, 2024\, from 5:00 p.m. to 6:00 p.m. Please use the following link to register: https://bit.ly/3zUje4Z. You may also call +1 (914) 614-3221 Access Code: 217-883-866. A brief presentation followed by questions and comments from the public will be held from 5:00 p.m. to 5:30 p.m. and again from 5:30 p.m. to 6:00 p.m. Questions and comments may be submitted via the online chat or with the raise hand feature for the project team to address directly. \nThe In-Person Open House is scheduled for Thursday\, December 19\, 2024\, from 6:00 p.m. to 7:00 p.m. at the Lakewood Park Village Hall\, 7508 Jennings Way\, Fort Pierce\, FL 34951\, and will have an informal open house format. FDOT staff and consultant staff members will be available to discuss the project and answer questions. If you are not able to join the online session\, a recording of it will be posted at https://www.d4fdot.com/tcfdot/index.asp. \nThe project improvements consist of milling and resurfacing the travel lanes to enhance safety and long-term resiliency\, widening the existing 5-foot paved shoulder to 7-feet to enhance safety\, constructing sidewalk (varying from 6 to 12 feet in width) along the east side of SR 607/Emerson Avenue from Hibiscus Road to North Road to enhance safety and connectivity for pedestrians\, upgrading curb ramps along existing sidewalks to enhance safety and connectivity for pedestrians\, installing concrete pads at two existing bus stops along northbound SR 607/Emerson Avenue\, located approximately 300 feet south of Hibiscus Road and approximately 100 feet north of Belleair Avenue\, to enhance safety\, functionality\, and long-term resiliency\, and upgrading signage and pavement markings to improve safety\, functionality\, and traffic operations.\nConstruction will begin in January 2025 at a cost of $6.4 million and is anticipated to be completed in Spring 2026. \nCommunity feedback is at the core of all we do\, FDOT works with the public to balance their community vision with the community’s transportation needs. This is routine on all our projects to ensure Florida’s infrastructure is safe\, resilient\, and efficient for many years into the future. \nFor more information\, contact FDOT Project Manager Josh Baker at (772) 429-4930 or email at Joshua.Baker@dot.state.fl.us.
URL:http://www.stlucietpo.org/event/open-house-for-the-state-road-sr-607-emerson-avenue-resurfacing-project/
LOCATION:Lakewood Park Village Hall\, 7508 Jennings Way\, Fort Pierce\, FL\, 34951\, United States
CATEGORIES:Public Involvement
ATTACH;FMTTYPE=image/png:http://www.stlucietpo.org/newsite/wp-content/uploads/2024/12/FDOT_emerson_openhouse2.png
END:VEVENT
END:VCALENDAR