SUN Trail Port of Fort Pierce Connector Feasibility Study
SUN Trail Connector Feasibility Study (June 2025)
¿Español? Haga clic arriba.Kreyòl Ayisyen? Klike sou pi wo a.
SUN Trail Connector Feasibility Study (June 2025)
The major update to St. Lucie County’s Transit Development Plan (TDP), branded as Reimagine Transit, was led by St. Lucie County’s Transit Department, which operates Area Regional Transit (ART) in… Continue Reading Reimagine Transit Development Plan
Kimley-Horn was retained by the St. Lucie TPO to conduct Spot Speed Studies to evaluate speed limits and travel speeds for three (3) arterial roads within St. Lucie County. According… Continue Reading Spot Speed Studies
For this analysis, the fatal crashes and the speed limits on the roadway network in the TPO area were reviewed to identify any consistencies. Crash data was obtained from the… Continue Reading Speed Kills Analysis
The Infrastructure Investment and Jobs Act (IIJA) requires the Florida Department of Transportation (FDOT) and the Metropolitan Planning Organizations (MPOs) to develop Carbon Reduction Strategies to reduce transportation emissions from… Continue Reading Development of Carbon Footprint Reduction Strategies